This is currently going through the design process.
Transport Infrastructure Ireland (TII) have said that a recent report on the M7/M9 interchange recommended extra advance-warning signage on the M7 mainline.
This is currently going through the design process.
The designers have requested a topographical survey to gauge the existing slope to the rear of the Vehicle Restraint System, to allow for the design of an adequate foundation and post sizing.
A Road Safety Audit will then be required, before finalising the design and issuing a construction package for installation.
It was also reported that extensive vegetation clearance works were completed in February to improve visibility of merging traffic.

Kfm Obituary Notices
Full Lineup Announced For 10-Day Kildare Readers Festival
Kildare-Based Doctor Gives Advice Ahead Of Cold And Flu Season
Kildare-Based Ambulance Service CEO Criticises HSE After NAS Workers Allege Harassment And Misogyny
Car "Completely Written Off" After Collision With HGV On Narrow Kilcock Street